Monday, 7 September 2009

Barrhead

Repairs and reshaping to the drive meant this drystone retaining wall in Barrhead had to be pushed back into the bank. We took the wall down and cut the bank back. This is the after shot with the wall rebuilt. You can see the original line where the monoblock is crooked. The slope is steep though it may not look too bad in this picture We cut steps into it and ran the stone courses in horizontally. This should have been easy enough, but the last few weeks have been very wet and the slope was a mud slide.

No comments:

Post a Comment